Classification and characteristics of cold storage board for cold storage installation equipment

<

After the library board arrives at the scene, it is not anxious to drop the goods. After the library board installation drawings are eaten, the cold storage boards are stacked in order to avoid useless handling and transfer when installing the board. The place where the goods are stacked should be reasonably selected to prevent obstruction of traffic and people's walking, and to protect the storage board from damage. After the goods are finished, carefully check whether the library board is in line and whether the size of the library board is in error. If there are abnormal circumstances, promptly report to the relevant personnel in a timely manner.

When installing the library board, strictly follow the drawings, and the bullet line should be accurate and straight. Divide the direction of the convex and concave surface of the library. (If the convex or concave surface is not included, the door may not be installed.) Each plate must be filled with foaming agent before assembly. The blowing agent can't be beaten less. Each grapple is caught by a hex. Make sure that each connector is firmly grasped during installation and the gap should not be too large. Guaranteed level, no skewing.

If the indoor is a tube evaporator, be sure to first put the tube into the library and then fight the last side of the wall panel, otherwise it will cause the tube evaporator to not enter the warehouse. In this case, pay attention to the protection of the pipe when laying the top.

When assembling the door, pay attention to the direction of the heating wire and the light switch wire. When assembling the top plate, be sure to make the threading hole and put the wire.

When the library board is assembled, tear the protective film and clean the contents of the assembly gap. If the cleaning is not clean, it will cause unevenness when playing the silicone. Use a plastic buckle to block the grapple hole.